Rebuilding Sainte-Thérèse d’Avila de GuinaudéeRekonstriksyon Legliz Sent Terèz d'Avila nan Ginode

The project is now in active foundation work. These are not concept images. These are photographs from the site.

Travay fondasyon an ap fèt. Foto sa yo soti sou teren an. Yo pa imaj ki fèt sou òdinatè pou montre yon pwojè.

WHERE THE PROJECT STANDSKOTE PWOJÈ A RIVE

The foundation phase is underway.Travay fondasyon an kòmanse.

After years of organizing, fundraising, parish development, technical planning, and site preparation, the reconstruction has moved into visible work on the ground. Current photographs show excavation, reinforced column cages, aggregate and sand delivery, and workers preparing structural elements.

This phase is material-intensive and depends on continued support from Ginode’s sons, daughters, friends, parishioners, and diaspora.

Apre plizyè ane òganizasyon, ranmasaj lajan, devlopman pawas la, plan teknik ak preparasyon teren an, travay konstriksyon an pran fòm. Foto yo montre fouy yo, fè pou kolòn yo, livrezon wòch ak sab, ansanm ak ekip k ap prepare estrikti a.

Etap sa a mande anpil materyèl. Li bezwen sipò pitit Ginode, zanmi kominote a, pawasyen yo ak dyaspora a pou l kontinye.

Current phase: foundation

Main materials: rebar, cement, wood

Etap kounye a: fondasyon

Materyèl prensipal yo: fè, siman, bwa

Workers carrying out active foundation work at the Sainte-Thérèse d’Avila church construction site in Guinaudée.

Church foundation work continues.Travay fondasyon Legliz Sent Terèz d’Avila a ap kontinye.

CURRENT SITE PHOTOSFOTO TRAVAY LA SOU TEREN AN

Construction you can seeGade konstriksyon an ak je pa w

Site preparation and reinforced foundation columns at the Sainte-Thérèse d’Avila church construction project in Guinaudée.

Site preparation
Layout, excavation, and reinforced structural points.

Preparasyon teren an
Tras fondasyon an, fouy yo ak fè pou estrikti a.

Construction materials and reinforced foundation work at the Sainte-Thérèse d’Avila church site in Guinaudée.

Materials on site
Aggregate, reinforcement, and active foundation preparation.

Materyèl sou teren an
Wòch, fè ak preparasyon fondasyon an.

Material delivery supporting foundation work at the Sainte-Thérèse d’Avila church construction site in Guinaudée.

Material delivery
Logistics and supplies supporting the next stage of work.

Livrezon materyèl
Transpò ak materyèl pou ede travay la avanse.

HOW WE GOT HEREKIJAN NOU RIVE LA

A project built step by stepYon pwojè k ap avanse etap pa etap

Survey & PlanningEtid teren an ak planifikasyon

Topographic work and engineering established the technical basis for the project.

Travay topografi ak etid enjenyè yo te bay pwojè a baz teknik li.

MobilizationKontribisyon kominote a

Between 2019 and 2023, contributions reached about $100,000. Most of it paid for the presbytery, which is finished. ANRG also built a storage building for church materials and supports the community clinic when needed. The church foundation now needs new gifts.

Ant 2019 ak 2023, kontribisyon yo rive apeprè $100,000. Pi fò nan lajan sa a te peye pou prezbitè a, ki fini kounye a. ANRG konstwi tou yon depo pou materyèl legliz la, e li soutni klinik kominotè a . Fondasyon legliz la bezwen nouvo don kounye a.

Parish InfrastructureEnfrastrikti pawas la

The presbytery was completed to support the pastoral life of the parish.

Prezbitè a fini pou soutni lavi ak sèvis pawas la.

Foundation WorkTravay fondasyon an

The project is now physically advancing through its foundation phase.

Travay la ap avanse sou fondasyon legliz la.

Nou pap kòmanse pou nou kanpe nan wout.

The foundation phase requires materials, money, labor, and determination. Every contribution helps move the work toward completion.

Fondasyon an mande materyèl, lajan ak travay. Chak kontribisyon ede nou avanse.